SAFETY & ENVIRONMENTAL MANAGEMENT PROGRAM
Commercial Construction Projects | Facility Maintenance Service Calls
2026 Edition | Version 1.1
Document Number | PRG-SAF-10282026-01 |
Version | 1.1 |
Effective Date | November 16, 2026 |
Program Owner | NM&C Inc. Safety Department |
Applies To | All NM&C Inc. employees, and all Service Providers (subcontractors, vendors, suppliers and their workers) performing work for or on behalf of NM&C Inc. |
Next Scheduled Review | November 16, 2027 |
HOW TO USE THIS PROGRAM
Part 1 sets the rules that apply to every job. Part 2 covers how work is planned and controlled on construction projects and on service calls. Part 3 contains the hazard-specific programs. Part 4 covers incidents, records and program review. The appendices are the working forms. A separate State Compliance Exhibit for each state and the District of Columbia lists the added state requirements and is used with this master program.
This program is built on federal OSHA as the national baseline, so it applies in every state where NM&C works. Before work starts in any state, the PM reviews the State Compliance Exhibit for that state. Where this program, a customer requirement, a contract, or a federal, state or local rule differ, the most protective requirement applies. Fill-in fields are highlighted in yellow.
Part 1 – Program Foundation
1. Safety and Environmental Policy Statement
NM&C Inc. ("NM&C") builds, remodels, maintains and repairs commercial facilities while those facilities are often open to the public. Nothing we do is so urgent that it cannot be done safely. NM&C is committed to sending every worker home in the same condition they arrived, protecting our customers’ employees and shoppers, and protecting the property and environment where we work.
To meet that commitment, NM&C will:
- Comply with the Occupational Safety and Health Act, the OSHA standards for construction (29 CFR 1926) and general industry (29 CFR 1910), approved State Plan rules, environmental laws, and the safety requirements of each customer and site.
- Plan every project and service call for safety before work starts, and give crews the time, tools, equipment and training to do the work correctly.
- Give every person on our work sites the authority and the duty to stop work they believe is unsafe, without fear of retaliation.
- Require every Service Provider to meet or exceed this program.
- Report, investigate and learn from every injury, near miss and environmental event, and correct the causes.
- Measure our safety performance and review this program at least once a year.
Safety is a condition of employment and a condition of every subcontract and purchase order. Leaders at every level are accountable for the safety of the people and work they direct.
Authorized Officer Signature Signature | Title / Date Title and date |
2. Purpose, Scope and Applicability
This program is NM&C’s written safety and health program. It is organized around the seven core elements OSHA recommends for effective programs: management leadership, worker participation, hazard identification and assessment, hazard prevention and control, education and training, program evaluation and improvement, and communication and coordination among host employers, contractors and staffing agencies.
References: OSHA Recommended Practices for Construction | OSHA Recommended Practices for Safety and Health Programs
Work covered
Work Type | Examples and Primary Rules |
Commercial construction projects | Interior remodels and refreshes, tenant improvements, distribution-center and warehouse repairs, roofing, site work, demolition and new installations. Governed primarily by 29 CFR 1926 (construction). |
Facility maintenance service calls | Repair and maintenance visits at operating retail stores, offices, distribution centers and similar commercial facilities: HVAC/R, electrical, plumbing, doors and docks, roofing repair, lighting, carpentry and general repairs. Governed primarily by 29 CFR 1910 (general industry), with 29 CFR 1926 applying when the work alters or builds. |
Emergency response calls | After-hours water intrusion, storm damage, board-ups, electrical failures and similar urgent calls. All rules in this program still apply; the pace of the call does not change the requirements. |
NM&C performs commercial work only. This program does not address public-works requirements. When it is unclear whether a task is construction or maintenance, NM&C applies the more protective rule (for example, the 4-foot general-industry fall protection trigger rather than the 6-foot construction trigger).
Who must follow this program
- All NM&C employees, including office staff when they visit a site.
- All Service Providers: subcontractors, vendors, field partners, suppliers performing installation, and their employees and lower-tier subcontractors.
- Visitors, inspectors and delivery personnel while on an NM&C-controlled work area, to the extent of site orientation and PPE rules.
Service Providers remain responsible for their own OSHA-compliant safety programs, training, equipment and supervision. This program sets the minimum NM&C expects; it does not take over a Service Provider’s legal duties to its own workers.
3. Definitions
Term | Meaning in This Program |
Authorized Employee | A trained person permitted to lock or tag out equipment and service it (see Appendix G). |
Affected Employee | A person who operates or works near equipment being locked out, or whose work is affected by the lockout. |
Competent Person | A person able to identify existing and predictable hazards and who has authority to take prompt corrective action (OSHA definition, 29 CFR 1926.32). Required for scaffolds, excavations, fall protection, silica and other tasks. |
Qualified Person | A person who, by degree, certificate, professional standing, or extensive knowledge, training and experience, can solve problems related to the subject matter (for example, a qualified electrical worker under NFPA 70E). |
Customer | The owner, tenant or facility operator for whom NM&C performs the work. |
Service Provider | Any subcontractor, vendor, supplier or field partner performing work for or on behalf of NM&C. |
NM&C Project Manager (PM) | The NM&C person responsible for a project or service account, including customer communication and documentation. |
Site Lead | The person directing the work at a location: the NM&C Superintendent on a project, or the lead technician or Service Provider Supervisor on a service call. |
Pre-Task Plan (PTP) | The written job hazard review completed before work starts (Appendix B). |
Incident | Any injury, illness, near miss, property damage, utility strike, fire, spill or release, vehicle event, security event or regulatory contact connected with our work. |
Near Miss | An unplanned event that did not cause injury or damage but could have. |
Stop Work Authority (SWA) | The right and duty of any person to pause work they believe is unsafe (Section 5). |
4. Roles and Responsibilities
Responsibilities are assigned by role. Names and contact numbers for each project are recorded on the Site Emergency Information sheet (Appendix A).
Role | Responsibilities |
Executive Leadership | Approve this program and provide the budget, staff and time needed to carry it out. Review safety performance at least quarterly and lead the annual program review. Set the expectation that schedule and cost never override safety. |
Safety Department / Safety Coordinator | Maintain this program, forms and training records; track regulatory changes. Coach PMs, Superintendents and Service Providers; perform site audits. Lead serious-incident investigations and OSHA notifications; maintain OSHA 300/300A/301 records. |
Operations Manager / Project Manager | Pre-qualify Service Providers and confirm insurance and safety documents before work starts. Obtain customer site rules, asbestos and hazardous-material information, shutdown approvals and access conditions. Confirm a Pre-Task Plan exists for each scope; follow up on corrective actions; notify the customer of incidents. |
Superintendent (Projects) | Run site orientation, daily pre-task huddles and weekly toolbox talks. Perform and document weekly site inspections (Appendix J); correct hazards immediately. Act as or confirm the competent person for each regulated task; control site access, public protection and housekeeping. |
Service Coordinator / Dispatcher | Pass every known hazard, site rule, access instruction and after-hours condition to the technician before the call. Monitor working-alone check-ins and escalate missed check-ins (Section 31). |
Service Provider Supervisor / Competent Person | Supervise their crew, run their crew’s safety program and training, and complete Pre-Task Plans. Report all incidents to the NM&C PM immediately; cooperate in investigations. Provide SDSs, lockout procedures, permits and competent-person designations on request. |
Every Worker | Follow this program, site rules and the Pre-Task Plan; wear required PPE. Use Stop Work Authority whenever needed. Report hazards, injuries, near misses and damage immediately to the Site Lead. |
5. Stop Work Authority and Non-Retaliation
ANYONE CAN STOP THE JOB
Every person on an NM&C work site has the authority and the responsibility to stop any task they believe puts people, property or the environment at risk. No one will be disciplined for a good-faith stop, even if the concern turns out to be unfounded.
1. Stop – Tell the people involved to stop and make the area safe if it can be done without added risk.
2. Notify – Tell the Site Lead and the NM&C PM.
3. Assess – The Site Lead and the crew review the concern and agree on the fix (revise the Pre-Task Plan if needed).
4. Resolve – Work resumes only after the hazard is corrected and the person who called the stop is informed.
5. Record – Document the stop on the Pre-Task Plan or the Event Report (Appendix D) and share the lesson.
Federal law prohibits retaliation against workers who report injuries, report hazards or raise safety concerns (OSH Act Section 11(c) and 29 CFR 1904.35). NM&C will not discourage reporting, and no incentive program, drug-testing practice or discipline policy will be used in a way that discourages workers from reporting injuries.
6. Multi-Employer Work Sites and Service Provider Requirements
Most NM&C work sites have more than one employer. Under OSHA’s multi-employer citation policy, an employer can be cited as the creating, exposing, correcting or controlling employer for a hazard. On projects NM&C manages, NM&C is generally the controlling employer and must use reasonable care to prevent and detect violations; each Service Provider is responsible for the hazards it creates or exposes its workers to.
References: OSHA CPL 02-00-124 Multi-Employer Citation Policy
Before work starts
Requirement | Detail |
Safety pre-qualification | Written safety program; most recent three years of OSHA 300A summaries (where required to keep them); Experience Modification Rate (EMR); any OSHA citations in the last three years. An EMR above 1.0 or serious citations require Safety Department review. |
Insurance | Certificate of insurance and endorsements meeting the NM&C Certificate of Insurance Requirements and the subcontract exhibit. |
Licenses and certifications | Trade licenses, EPA Section 608 (refrigerants), forklift/MEWP operator training, and other credentials the scope requires. |
Competent / qualified persons | Names of the competent or qualified persons for scaffolds, excavation, fall protection, silica, electrical and other regulated tasks. |
Hazard information | SDSs for chemicals brought on site, lockout procedures, hot work and confined space procedures as applicable. |
Orientation | Every worker attends NM&C site orientation (projects) or reviews the Service Call Safety Check (service calls) before starting. |
During the work
- Follow the Pre-Task Plan, customer site rules and this program. Supervise your crew at all times.
- Attend toolbox talks or hold your own and provide sign-in records (Appendix F) on request.
- Correct hazards you create immediately. If NM&C or the customer identifies a hazard, correct it or stop the affected work.
- Report every incident and near miss to the NM&C PM immediately; submit an Event Report within 24 hours.
- Repeated or serious violations may result in removal of workers, stop-work orders, back-charges for corrective work, or termination of the subcontract, as provided in the subcontract documents.
Part 2 – Planning, Supervision and Training
7. Hazard Identification and Pre-Task Planning
Hazards are found and controlled before work begins, re-checked as conditions change, and corrected the moment they are found. NM&C uses the hierarchy of controls, choosing the most effective control that is feasible:
Control Level | NM&C Examples |
1. Eliminate | Prefabricate off site; schedule work when the store is closed; perform the work from the ground instead of at height. |
2. Substitute | Use a lower-hazard product or method (water-based adhesives, battery tools instead of fuel-powered tools indoors). |
3. Engineering controls | Guardrails, hole covers, dust extraction on saws and grinders, GFCI protection, barricades, ventilation. |
4. Administrative controls | Permits, lockout, Pre-Task Plans, schedules, signage, training, spotters, work-rest cycles. |
5. PPE | Hard hats, eye and face protection, gloves, high-visibility apparel, hearing protection, respirators, fall arrest. PPE is the last line of defense, not the first. |
Pre-Task Plan (Appendix B)
- Completed by the Site Lead with the crew before each new task, each shift, and whenever the work, crew, equipment or conditions change.
- Lists each work step, the hazards of that step, and the specific controls; identifies required permits (hot work, energized work, confined space, roof access).
- Every crew member reviews and signs it. It stays at the work location for the shift and is then kept with the project or work order records.
Triggers for a new or revised Pre-Task Plan
☐ New task or scope change | ☐ New crew member or Service Provider | ☐ Weather or site change |
☐ Incident or near miss | ☐ Work at height or on a roof | ☐ Hazardous energy or energized work |
☐ Hot work | ☐ Excavation or penetrations | ☐ Suspect asbestos, lead or mold |
8. Construction Project Safety Planning
Preconstruction
- Review drawings, scope and schedule for high-risk work: work at height, demolition, excavation, energized systems, hot work, cranes and rigging, roof work, and work over the public.
- Obtain the customer’s site rules, asbestos survey or inspection report, utility locations, fire-protection impairment procedures, and any hazardous material information.
- Complete the Site Emergency Information sheet (Appendix A), including the nearest emergency room and occupational clinic, before mobilizing.
- Confirm required permits and notices: building permits, NESHAP asbestos notification, hot work permits, street or sidewalk permits, and utility locate tickets.
- Identify the competent person for each regulated activity and confirm Service Provider training.
Daily and weekly routine
Activity | Frequency | Record |
Site orientation | Before a worker’s first shift on site | Orientation sign-in (Appendix F) |
Pre-task huddle and Pre-Task Plan | Start of each shift and each new task | Appendix B |
Toolbox talk | At least weekly, and at the start of each new job | Appendix F |
Site safety walk | At least weekly, plus daily Superintendent observation | Appendix J and the Daily Log |
Equipment inspections | Before each use or shift (ladders, scaffolds, lifts, tools, slings) | Manufacturer or Service Provider checklist |
Corrective action follow-up | Until closed | Appendix J action log |
9. Facility Maintenance Service Call Safety
Service calls carry hazards a construction site does not: the technician often works alone, arrives without a site walk, works on equipment owned by the customer, and works around customers and the public. Every service call follows the Arrive – Assess – Act – Close sequence below and the one-page Service Call Safety Check (Appendix B, Part 2).
ARRIVE | ASSESS | ACT | CLOSE |
Check in with the store or site manager. Sign the customer visitor/vendor log. Confirm the work area and any site rules. Start the working-alone check-in if applicable. | Walk the work area before unloading tools. Identify customer and public traffic, energy sources, height, roof access, asbestos/lead concerns and fire systems. Complete the Service Call Safety Check. | Set up barricades and signage. Lock out customer equipment using your own lock. Use the right ladder, lift and PPE. Stop and call the PM if conditions do not match the work order. | Remove locks only after equipment is safe. Clean up; restore egress, fire systems and ceiling tiles. Tell the manager the status of the equipment. Report any incident or near miss. |
Service call rules
- Dispatch information. The Service Coordinator passes along all known hazards, access instructions, roof access details, alarm procedures and after-hours conditions. Technicians call the PM before starting if the dispatch information is wrong or incomplete.
- Customer equipment. Never rely on a customer’s disconnect, lock or verbal assurance. Apply your own lock and verify zero energy (Section 18). Do not operate customer forklifts, balers, compactors or lifts unless the customer authorizes it in writing and you are trained and authorized on that equipment.
- Rooftop units. Before accessing a roof, confirm the access method (fixed ladder, hatch, interior stairs), locate skylights and roof edges, and plan fall protection (Section 14). Never step on skylights or sit on them.
- Suspect materials. Do not disturb ceiling tiles, pipe insulation, floor tile, mastic, drywall compound or roofing in older buildings until the PM confirms the material has been tested or is known to be asbestos-free (Section 23).
- Emergencies in progress. On water, fire, gas or electrical emergency calls, confirm that utilities are isolated and the area is safe before entering. Never enter standing water where electrical equipment may be energized.
- Scope creep. If the customer asks for extra work on site, stop and complete a new Pre-Task Plan for that work, and confirm approval with the PM.
10. Occupied Facilities and Public Protection
Much of NM&C’s work is done inside stores, warehouses and offices that remain open. The customer’s employees and the public must be protected from our work at all times.
- Separate the work area from the public with barricades, caution tape, partitions or temporary walls appropriate to the hazard. Use signage such as "Work Area – Authorized Personnel Only" and floor-level wet-floor signs.
- Never perform overhead work above an open aisle or occupied area. Close the aisle below and establish an exclusion zone sized for the height and the dropped-object hazard.
- Keep exits, exit signs, emergency lighting, fire extinguishers, sprinklers, fire alarm devices, fire department connections and electrical panels unobstructed. Maintain at least the egress width the customer and fire code require.
- If a fire alarm or sprinkler system must be impaired, follow the customer’s impairment procedure, notify the monitoring company and the authority having jurisdiction when required, and provide a fire watch as directed.
- Control dust, odors and noise: use dust barriers, HEPA vacuums and negative air where needed; schedule odorous or noisy work after hours. Healthcare and food facilities may require an infection-control or food-safety risk assessment; follow the customer’s procedure.
- Secure tools, materials, cords and equipment at the end of every shift. Never leave a lift, ladder or open hole unattended in a public area.
- Route cords and hoses away from walkways or cover them with cord protectors.
11. Inspections, Audits and Hazard Correction
Inspection | Who | Notes |
Pre-use equipment checks | Each user | Ladders, lifts, harnesses, tools, cords, extinguishers. Remove defective items from service and tag "Do Not Use". |
Daily site observation | Site Lead | Housekeeping, fall protection, barricades, egress, fire safety, PPE use. |
Weekly site safety walk | Superintendent with a crew representative | Documented on Appendix J. Washington requires a joint weekly walk-around on construction sites. |
Monthly / periodic audit | Safety Coordinator or PM | Random project and service-call audits, including document review. |
Annual LOTO procedure inspection | Authorized employee other than the one using the procedure | Required at least annually under 29 CFR 1910.147(c)(6). |
Customer and insurer audits | As scheduled | Findings are entered in the corrective action log. |
Hazards are corrected based on severity: an imminent danger is corrected immediately or the area is evacuated; serious hazards are corrected before work continues in that area; other items are assigned an owner and due date and tracked to closure.
12. Training and Competency
Training is provided in a language and vocabulary workers understand, before a worker is exposed to a hazard, and again when the work, equipment or rules change or when a worker shows they did not retain it. Service Providers train their own workers and provide records on request.
Topic | Who Needs It | Frequency / Notes |
Program orientation and Stop Work Authority | All employees and Service Provider workers | At hire or first assignment; annual refresher |
OSHA 10-Hour (Construction or General Industry) | All NM&C field employees (NM&C standard) | Once; required by law in some locations (see the State Compliance Exhibits) |
OSHA 30-Hour Construction | Superintendents and PMs (NM&C standard) | Once; refresh every 5 years recommended |
Hazard Communication / GHS | All exposed workers | At assignment and when new chemicals are introduced |
Fall protection and ladders | Anyone exposed to falls | Before exposure; retrain when deficiencies observed |
MEWP / aerial lift operator | Lift operators | Before operation, plus familiarization on each model |
Forklift / powered industrial truck | Operators | Before operation; evaluation at least every 3 years (29 CFR 1910.178(l)) |
Lockout/Tagout | Authorized and affected employees | Before assignment; retrain on changes or deficiencies |
Electrical safety (NFPA 70E) | Qualified electrical workers | At least every 3 years and when deficiencies observed |
Silica, asbestos awareness, lead | Exposed workers | Before exposure; asbestos awareness annually where required |
Respirator use and fit test | Required respirator users | Medical evaluation before use; fit test at least annually |
First aid / CPR / AED | At least one person per crew where medical help is not readily available | Per certifying body (typically 2 years) |
Heat illness prevention | All outdoor and hot-indoor workers | Before heat season and at hire |
Competent person training | Designated competent persons | Per task (scaffold, excavation, fall protection, silica) |
13. Communication and Worker Participation
- Toolbox talks are held at least weekly on projects and documented on Appendix F. Topics come from recent incidents, inspection findings, upcoming work and seasonal hazards.
- Pre-task huddles start each shift and review the Pre-Task Plan.
- Reporting channels. Workers may report hazards to the Site Lead, the PM or the Safety Department, or anonymously through the method posted at the NM&C office. Every report receives a response.
- Worker involvement. Workers help write Pre-Task Plans, take part in inspections and investigations, and suggest improvements.
- Lessons learned from incidents are shared across all NM&C projects and with affected Service Providers within one week of the investigation.
- Postings. The OSHA "Job Safety and Health – It’s the Law" poster (or State Plan equivalent) is posted at NM&C offices and on projects with a field office; the OSHA 300A summary is posted February 1 through April 30 each year.
Part 3 – Hazard-Specific Programs
Each program below lists the NM&C minimum requirements. Service Providers performing the activity must also follow their own written procedures and the OSHA standard cited.
14. Fall Protection
Situation | Trigger Height | Primary Rule |
Construction work (unprotected side or edge) | 6 feet | 29 CFR 1926.501 |
Maintenance / service work (general industry) | 4 feet | 29 CFR 1910.28 |
Scaffolds (construction) | 10 feet | 29 CFR 1926.451(g) |
Any height over dangerous equipment or open vats | Any height | 1910.28(b)(6) / 1926.501(b)(7) |
NM&C standard when the rule is unclear | 4 feet | Most protective rule applies |
- Acceptable systems: guardrails, safety nets, personal fall arrest systems (full-body harness, shock-absorbing lanyard or self-retracting lifeline, and an anchor rated for 5,000 lb per worker or designed by a qualified person), travel-restraint systems, and covers.
- Holes and skylights: cover or guard every floor hole, roof hole and skylight. Covers must support at least twice the expected load, be secured, and be marked "HOLE" or "COVER".
- Low-slope roofs (service work): under 1910.28(b)(13), work less than 6 feet from the edge requires guardrails, nets, fall arrest or travel restraint; designated areas and work rules are allowed farther back only for work that is both infrequent and temporary. NM&C technicians use travel restraint or a designated area whenever they approach within 15 feet of an unprotected edge.
- Fixed ladders extending more than 24 feet above a lower level require a personal fall arrest system or ladder safety system.
- Rescue: every job using fall arrest has a written rescue plan that can reach a suspended worker promptly. Suspension trauma relief straps are worn with harnesses.
- Inspection: harnesses, lanyards and anchors are inspected before each use; any equipment that has arrested a fall is removed from service.
References: 29 CFR 1910.28 | 29 CFR 1926.501
15. Ladders and Scaffolds
Ladders
- Use the right ladder for the task and load (duty rating includes the worker, tools and materials). Use non-conductive (fiberglass) ladders near electrical work.
- Inspect before use. Set extension ladders at a 4:1 angle, secure them, and extend the side rails at least 3 feet above the landing.
- Maintain three points of contact while climbing; do not carry loads in your hands while climbing; do not stand on the top step or top cap of a stepladder.
- Never use a stepladder folded and leaned against a wall, and never place a ladder on boxes, carts or unstable surfaces. Barricade the base in public areas.
Scaffolds and rolling platforms
- Erected, moved, altered and dismantled only under a competent person, by trained workers, following the manufacturer’s instructions.
- Inspected by a competent person before each shift and after any event that could affect its integrity. Tag scaffolds green (ready), yellow (special conditions) or red (do not use).
- Fully planked, with guardrails, toe boards where people or objects may be below, and safe access. Lock casters on rolling scaffolds; never ride a rolling scaffold while it is moved.
- Baker-style and similar narrow-frame scaffolds must have guardrails when the platform is 10 feet or more above a lower level, and must be used within the manufacturer’s height-to-base limits.
16. Aerial Lifts and Mobile Elevating Work Platforms (MEWPs)
- Only trained and authorized operators may run a MEWP. Operators receive familiarization on each make and model before use, consistent with ANSI/SAIA A92.22 and A92.24.
- Complete a pre-use inspection and function test every shift; review the work area for drop-offs, holes, overhead obstructions, power lines and soft floors (including the floor load rating in older buildings and mezzanines).
- Boom lifts: wear a full-body harness with a lanyard attached to the manufacturer’s anchor point in the platform. Scissor lifts: stay inside the guardrails with the gate closed; attach to the designated anchor where the manufacturer or site requires.
- Never climb or stand on guardrails, never exceed the rated load, and never operate outdoors above the manufacturer’s wind limit.
- Maintain at least 10 feet clearance from overhead power lines up to 50 kV, and more for higher voltages.
- Barricade the area beneath and around the platform in public or occupied spaces. Have a trained ground person who can lower the platform in an emergency.
17. Electrical Safety
NM&C ELECTRICAL RULE
Electrical work is performed de-energized. Before work at 50 volts or more, an electrically safe work condition is established: identify sources, interrupt the load, open the disconnect, visually verify where possible, apply lockout, test each phase conductor or circuit part at each point of work with a properly rated tester (testing the tester before and after), and ground where induced or stored energy may exist.
- Energized work is allowed only when de-energizing creates a greater hazard or is infeasible, and only by qualified persons. Justified energized work requires a written energized electrical work permit approved by the NM&C PM, except for tasks the current edition of NFPA 70E exempts (such as testing, troubleshooting and voltage measuring), which still require shock and arc flash risk assessments and proper PPE.
- Only qualified electrical workers may open energized panels, remove dead fronts, or work within the limited approach boundary.
- Construction power: all 120-volt, single-phase 15-, 20- and 30-amp temporary receptacles must be GFCI-protected or covered by an assured equipment grounding conductor program (29 CFR 1926.404(b)(1)). NM&C standard: use GFCI protection on every portable cord and tool.
- Inspect cords and tools before each use; remove damaged items from service. Do not use cords with missing ground pins, splices or exposed conductors. Do not run cords through doors, windows or ceilings.
- Keep 36 inches of clear working space in front of electrical panels; keep panel covers closed and labeled.
- Assume overhead and underground lines are energized until the utility confirms otherwise.
References: NFPA – When Is an Energized Work Permit Required
18. Hazardous Energy Control (Lockout/Tagout)
Any servicing or maintenance where unexpected start-up, energizing or release of stored energy could hurt someone requires lockout under the NM&C procedure in Appendix G and, where needed, an equipment-specific energy control sheet (Appendix H).
- Each authorized worker applies a personal lock and tag. Locks are individually keyed and used only for energy control.
- Customer equipment: NM&C and Service Providers coordinate with the customer before shutting down equipment, and inform the customer’s affected employees. When both the customer and NM&C have energy control procedures, the two employers inform each other of their procedures (29 CFR 1910.147(f)(2)).
- Tagout alone is permitted only where the energy-isolating device cannot accept a lock, and only with the additional measures required by 29 CFR 1910.147.
- Group lockout, shift change and lock-removal-by-others follow Appendix G.
- Each lockout procedure is inspected at least annually and training is documented.
References: 29 CFR 1910.147 | 29 CFR 1910.147 Appendix A | OSHA Control of Hazardous Energy
19. Hot Work
Hot work includes welding, cutting, brazing, soldering, torch-applied roofing, grinding that throws sparks, and thawing pipes with a torch. Hot work requires a permit (Appendix I) issued by the Site Lead after confirming the customer’s hot work rules.
- First ask whether the work can be done another way (mechanical cutting, press fittings, cold-applied roofing).
- Move combustibles at least 35 feet away or protect them with fire-resistant covers; cover floor and wall openings within 35 feet.
- Confirm that sprinklers and fire alarms are in service; if a detection zone must be bypassed, follow the impairment procedure.
- Provide a trained fire watch with a suitable extinguisher during the work and for at least 60 minutes after it ends (the 2019 edition of NFPA 51B lengthened the post-work fire watch from 30 minutes to 1 hour; the OSHA minimum is 30 minutes). Continue monitoring the area for up to 3 more hours when the permit authorizer requires it.
- Inspect cylinders, hoses, regulators and flashback arrestors; store and transport cylinders upright and secured, with valve caps on when not in use.
References: OSHA Fire Watch Duties (OSHA 4188) | ANSI Blog – NFPA 51B-2019 Changes
20. Fire Prevention
- Provide at least one 2-A rated (or larger) fire extinguisher within 100 feet of travel on every construction floor area, and extinguishers at hot work, fuel and flammable storage locations.
- Store flammable liquids in approved safety cans and cabinets; keep only one day’s supply in the work area. No fuel-powered equipment indoors without ventilation and CO monitoring.
- Remove combustible debris daily. Keep oily rags in metal containers with lids.
- Smoking and vaping only in designated areas approved by the customer; never on roofs or near flammables.
- Follow NFPA 241 practices and the customer’s procedures for construction in buildings, including keeping fire protection systems in service as long as possible.
21. Personal Protective Equipment (PPE)
The Site Lead assesses each task for PPE needs and documents it on the Pre-Task Plan; general-industry work requires a written, certified PPE hazard assessment (29 CFR 1910.132(d)). NM&C provides required PPE to its employees at no cost as required by 29 CFR 1910.132(h). Service Providers equip their own workers.
PPE | NM&C Minimum |
Head protection | Hard hat on all construction sites and wherever overhead or bump hazards exist. Type II (top and side impact) helmets with chin straps are recommended for work at height. |
Eye and face | ANSI Z87.1 safety glasses at all times on construction sites; goggles or face shields for grinding, cutting, chemicals and overhead drilling. |
High-visibility apparel | ANSI/ISEA 107 Class 2 or higher near vehicle traffic, mobile equipment, docks and parking lots. |
Hand protection | Cut-resistant gloves for sheet metal, glass and blades; chemical gloves per SDS; rated electrical gloves for qualified electrical work. |
Foot protection | Sturdy work boots; protective-toe footwear where crushing or puncture hazards exist. |
Hearing protection | Required where noise is 85 dBA or more, or when you must raise your voice to be heard at arm’s length. |
Respiratory protection | Used under a written respiratory protection program with medical evaluation and annual fit testing (29 CFR 1910.134). Voluntary-use filtering facepieces require Appendix D of 1910.134 information. |
Arc-rated clothing | Per the arc flash risk assessment for energized electrical work. |
22. Hazard Communication
- Keep a chemical inventory and a current Safety Data Sheet (SDS) for every hazardous product on site, accessible to all workers during their shift (electronic access is acceptable if it is reliable).
- Every container is labeled. Secondary containers carry the product name and hazard information.
- Train workers on the hazards, labels, pictograms and SDS sections before they use a chemical.
- Service Providers provide SDSs for products they bring on site; customers provide information about chemicals in the work area (for example, in a store’s cleaning, pool or garden section).
- OSHA updated the Hazard Communication Standard in 2024. Employers must update workplace labeling, the written program and training for affected substances by November 20, 2026, and for mixtures by May 19, 2028. NM&C will update this program and training on that schedule.
References: OSHA HazCom 2024 Compliance Dates
23. Asbestos, Lead and Mold in Existing Buildings
DO NOT DISTURB SUSPECT MATERIAL
Before any renovation or demolition of a commercial building, the Clean Air Act asbestos rule (NESHAP) requires a thorough inspection for asbestos. Written notice to the state or EPA is required at least 10 working days before demolition, and before renovation when regulated asbestos meets or exceeds 260 linear feet, 160 square feet or 35 cubic feet.
- The PM obtains the asbestos survey or inspection results from the customer before work that disturbs building materials. If none exists, the PM arranges for an accredited inspector.
- Under OSHA (29 CFR 1926.1101), thermal system insulation and surfacing material in buildings constructed no later than 1980 are presumed asbestos-containing until shown otherwise. Floor tile, mastic, joint compound, roofing and ceiling tile in older buildings are also common suspects.
- Only licensed and trained abatement contractors may remove or disturb asbestos-containing materials. NM&C workers stop immediately and notify the PM if suspect material is found unexpectedly.
- Lead (29 CFR 1926.62): assume lead is present in older paint and coatings until tested. Use lead-safe methods for sanding, grinding, torch cutting or demolition of painted surfaces, and follow EPA’s Renovation, Repair and Painting rule if the space is a pre-1978 child-occupied facility.
- Mold and water damage: stop work if visible mold exceeds a small area, isolate the area, and follow the PM’s remediation plan and the customer’s procedures.
References: 40 CFR 61.145 (Asbestos NESHAP)
24. Respirable Crystalline Silica
Cutting, grinding, drilling, coring or demolishing concrete, masonry, tile, stone or drywall compound can create silica dust. On construction work, OSHA’s silica standard requires either full use of the engineering controls in Table 1 or an exposure assessment, plus a written exposure control plan and a competent person.
- Use Table 1 controls: integrated water delivery or a shroud with a dust collector and HEPA filter for saws, grinders and drills, with the respirator listed in Table 1 when required.
- No dry sweeping or compressed air for silica dust. Use wet methods or HEPA vacuums.
- Restrict access to the dust area and protect customers and the public with barriers or negative air.
- Service Providers performing silica tasks submit their written exposure control plan before starting.
References: 29 CFR 1926.1153
25. Confined Spaces
A confined space is large enough to enter, has limited entry or exit, and is not designed for continuous occupancy. Common examples on our work include utility vaults, pits, crawl spaces, large ductwork, tanks, boilers, sumps and some attic spaces.
- No one enters a space that may be a permit-required confined space (hazardous atmosphere, engulfment, entrapment or other serious hazard) unless a written permit program under 29 CFR 1926 Subpart AA (construction) or 29 CFR 1910.146 (general industry) is in place, with trained entrants, attendants, supervisors and a rescue plan.
- Test the atmosphere before and during entry for oxygen, flammables and toxic gases, in that order.
- Customers must share what they know about confined spaces at their facilities, and NM&C shares that information with Service Providers before entry.
26. Excavation, Trenching and Underground Utilities
- Call 811 and wait for locates before any digging, coring, trenching or driving stakes. Private utilities on customer property may require a private locating service.
- A competent person inspects excavations daily, before each shift and after rain or other events.
- Trenches 5 feet deep or more require a protective system (sloping, benching, shoring or a trench box) unless in stable rock; 20 feet or more requires a design by a registered professional engineer.
- Provide a ladder or ramp within 25 feet of lateral travel in trenches 4 feet deep or more; keep spoils and equipment at least 2 feet from the edge.
- Concrete coring and saw cutting in slabs: scan for embedded conduit, post-tension cables and piping before cutting.
27. Hand and Power Tools
- Use tools only for their intended purpose and with all guards in place. Inspect before use and remove damaged tools from service.
- Powder-actuated tools: operators must be trained and carry proof of training; never point the tool at anyone; check the material before fastening.
- Unplug or remove batteries before changing blades or bits. Use the side handle on grinders and drills.
- Use dust extraction on cutting and sanding tools where dust is produced.
28. Material Handling, Rigging and Powered Industrial Trucks
- Plan lifts to minimize manual handling: use carts, dollies, lifts and team lifts. Get help for loads over 50 pounds or awkward loads.
- Rigging is inspected before each use by a competent person; damaged slings are removed from service. Crane work requires a lift plan, a qualified rigger and signal person, and a certified operator as required by 29 CFR 1926 Subpart CC.
- Forklifts and other powered industrial trucks are operated only by trained and evaluated operators (29 CFR 1910.178(l) and 1926.602(d)). Do not use a customer’s forklift without written authorization. Never lift people on forks unless using an approved work platform secured to the forks.
- At distribution centers and docks, follow the customer’s traffic rules, chock trailers or confirm dock locks, and wear high-visibility apparel.
29. Heat, Cold and Wildfire Smoke
OSHA has proposed, but not finalized, a federal heat injury and illness prevention rule; until a rule is final, OSHA enforces heat hazards through the General Duty Clause and its National Emphasis Program on heat, revised in April 2026. Several states already have heat rules; see the State Compliance Exhibits. The NM&C triggers below apply in every state, and a stricter state rule always governs.
References: OSHA Heat Rulemaking | Beveridge & Diamond – Heat NEP Update | State Heat Rules Summary 2026
Heat Index | NM&C Required Actions (Indoor and Outdoor) |
80°F or above (initial trigger) | Cool drinking water (about 1 quart per worker per hour available), shade or cool rest area, acclimatization plan for new and returning workers, buddy system, and paid rest breaks as needed to cool down. |
90°F or above (high heat) | All of the above plus mandatory rest breaks (NM&C standard: at least 15 minutes every 2 hours), observation of workers for heat illness signs, pre-shift heat safety meeting, and a plan to reschedule strenuous work to cooler hours. |
Any heat illness sign | Stop work, cool the worker, and call 911 for confusion, collapse, seizures or hot dry skin. Never leave a worker with heat symptoms alone or send them home unaccompanied. |
- Cold: provide warm break areas, layered clothing, and watch for frostbite and hypothermia; clear snow and ice from walking surfaces and roofs before work.
- Wildfire smoke: some states set mandatory protections tied to the Air Quality Index (see the State Compliance Exhibits). In those states, the Site Lead checks the AQI at the start of each shift and follows the state rule. In every state, NM&C provides N95 respirators for voluntary use when wildfire smoke is present.
30. Housekeeping and Walking-Working Surfaces
- Clean as you go; remove debris at least daily and before leaving a customer site.
- Keep aisles, stairs, exits and access routes clear. Mark and correct slip and trip hazards immediately; use wet-floor signs.
- Stack and secure materials so they cannot fall, roll or tip; keep materials away from edges and openings.
- Provide adequate lighting in work areas and stairways.
31. Working Alone, After-Hours Work and Workplace Violence
Working alone and after hours
- A worker who is alone on a site checks in with the Service Coordinator or supervisor on arrival, at agreed intervals (NM&C standard: at least every 2 hours), and on departure. A missed check-in is followed up within 30 minutes; if the worker cannot be reached, the supervisor contacts site security or emergency services.
- The following tasks are never performed alone: energized electrical work, confined space entry, work requiring fall arrest, hot work requiring a fire watch, and trenching.
- At night, park in well-lit areas close to the entrance, keep doors locked behind you where the customer permits, and know the alarm procedure.
Workplace violence
- NM&C does not tolerate threats, harassment, intimidation or violence. Weapons are prohibited on NM&C work sites to the extent permitted by law and customer policy.
- If a customer, member of the public or co-worker becomes threatening, disengage, move to a safe place and call 911 or site security. Do not attempt to confront shoplifters or intruders.
- Report every incident of violence or threats on an Event Report (Appendix D).
- California: most employers must have a written workplace violence prevention plan and maintain a violent incident log under Labor Code section 6401.9. NM&C maintains a California addendum when it has employees working in California.
References: Cal/OSHA Workplace Violence Prevention
32. Vehicles and Driving
- Drivers must have a valid license for the vehicle class, wear seat belts, and obey all traffic laws.
- No handheld phone use, texting or typing while driving. Pull over safely to take calls or use navigation.
- Secure cargo, ladders and materials so they cannot shift or fall. Use a spotter or walk around the vehicle before backing.
- Commercial motor vehicles (over 10,000 lb gross weight rating in interstate commerce, or as defined by state law) require DOT medical cards, hours-of-service compliance and inspections.
- Report every vehicle incident, regardless of damage, to the supervisor and PM.
33. Environmental Management
- Spills: keep a spill kit with every crew that uses fuel, oil, refrigerant oil, adhesives or chemicals. Stop the source, contain the spill, protect drains, and notify the Site Lead and PM. Releases that reach a storm drain, soil or waterway, or that exceed a reportable quantity, require notice to the National Response Center (1-800-424-8802) and/or the state environmental agency; the PM and Safety Department make that determination.
- Waste: dispose of construction debris through licensed haulers. Handle fluorescent lamps, batteries and mercury devices as universal waste. Never pour paint, solvents or chemicals into sinks, toilets or storm drains.
- Refrigerants: only EPA Section 608 certified technicians may open refrigerant circuits. Recover refrigerant with certified equipment; never vent it. Keep records as required.
- Stormwater and dust: protect storm drains near exterior work; control dust and tracking at site entrances.
- Customer environmental rules: follow customer requirements for waste segregation, recycling and hazardous materials.
34. Emergency Action and First Aid
- Each project has a completed Site Emergency Information sheet (Appendix A) posted in the field office or job box, showing emergency numbers, the site address, assembly point, nearest hospital and occupational clinic, and fire extinguisher and first aid kit locations. Service calls use the customer’s emergency procedures, reviewed at check-in.
- Know two ways out of every work area. On alarm, stop work, make equipment safe if it takes only seconds, evacuate to the assembly point and account for your crew.
- If medical care is not reasonably accessible (OSHA interprets this as within about 3 to 4 minutes for life-threatening injuries), a trained first aid and CPR provider must be available on the crew. First aid kits are stocked and checked weekly.
- Provide an eyewash where workers may be exposed to corrosive chemicals.
- Severe weather: stop outdoor and roof work and move to shelter when lightning is within about 10 miles (when thunder can be heard) and wait 30 minutes after the last thunder before resuming. Secure materials on roofs before high winds.
Part 4 – Incidents, Records and Program Review
35. Incident Reporting and Notification
Report every incident, including near misses, right away. Early reporting gets people care faster and lets us fix the cause before someone else is hurt.
1 | Protect and care. Stop work, make the scene safe, give first aid, and call 911 for any serious injury or illness. Do not move a seriously injured person unless they are in danger. |
2 | Notify immediately. The Site Lead calls the NM&C PM, who notifies the Safety Department and, as required, the customer. Report serious events by phone, not text or email alone. |
3 | Preserve the scene. Do not disturb the area or equipment involved in a serious event, except to rescue people or prevent further harm. Take photographs. |
4 | Document within 24 hours. Complete the Event Report (Appendix D) and Witness Accounts (Appendix E) and send them to the PM. |
5 | Investigate and correct. Follow Section 36 and track corrective actions to closure. |
OSHA severe-injury reporting (Safety Department responsibility)
Event | Deadline to Report to OSHA | How |
Work-related fatality | Within 8 hours of learning of it | Call 1-800-321-6742 (1-800-321-OSHA), call the nearest OSHA area office, or report online |
In-patient hospitalization, amputation or loss of an eye | Within 24 hours of learning of it | Same as above |
Fatalities must be reported if they occur within 30 days of the incident, and hospitalizations, amputations and eye losses if they occur within 24 hours of the incident. State Plan states may have shorter deadlines or broader requirements (for example, California requires reporting of serious injuries within 8 hours). Service Providers make the report for their own employees and notify NM&C at the same time.
References: 29 CFR 1904.39 | OSHA – Report a Fatality or Severe Injury
36. Incident Investigation and Corrective Action
- Every incident and near miss is investigated. The Site Lead leads routine investigations; the Safety Department leads investigations of recordable injuries, serious near misses, fires, utility strikes and environmental releases.
- Investigations start as soon as the scene is safe, ideally the same shift, and focus on facts and systems, not blame.
- Look past the immediate cause (what happened at the point of the event) to the underlying causes: planning, training, supervision, procedures, equipment, scheduling pressure, site conditions and coordination between employers. Asking "why" several times helps reach the root cause.
- Each corrective action has an owner, a due date and a verification step. The investigation is closed only after the actions are verified to be in place and effective.
- Lessons learned are shared with all NM&C crews and affected Service Providers.
References: OSHA Incident Investigation | OSHA Incident Investigation Guide
37. Injury Management and Return to Work
- Employees receive prompt medical care. Non-emergency injuries are directed to the occupational clinic listed on Appendix A, where state workers’ compensation law allows.
- A supervisor or designee accompanies an injured employee to care when practical and arranges transportation; an injured employee should not drive themselves to treatment.
- NM&C offers modified or transitional duty within medical restrictions when available.
- Medical, workers’ compensation, wage, date-of-birth and Social Security information is kept confidential by the Human Resources and Safety Departments and is never placed on field forms or shared with Service Providers or customers.
38. OSHA Recordkeeping
- NM&C keeps the OSHA 300 Log, 300A Summary and 301 Incident Report (or equivalent) for each establishment when required. Employers with 10 or fewer employees during the entire prior year are generally exempt from routine recordkeeping, but all employers must report severe injuries (Section 35).
- Recordable cases are entered within 7 calendar days of learning of them. Service Provider employees are recorded on the Service Provider’s log, not NM&C’s, unless NM&C supervises them day to day.
- The 300A is certified by a company executive and posted from February 1 to April 30. Records are kept for 5 years after the end of the year they cover.
- Electronic submission is due by March 2 each year for covered establishments: establishments with 250 or more employees submit the 300A; establishments with 20 to 249 employees in designated industries (which include construction) submit the 300A; and establishments with 100 or more employees in designated high-hazard industries (which include some construction trades, such as NAICS 2381 foundation, structure and building exterior contractors) also submit the 300 and 301 information.
References: OSHA Recordkeeping Forms | 29 CFR 1904.41
39. OSHA and Regulatory Inspections
1. Greet the inspector politely, ask for credentials, and record the inspector’s name and office. Ask them to wait a reasonable time while you call the PM and Safety Department (do not refuse entry).
2. On a customer site, notify the customer’s representative immediately; the customer may want to attend.
3. Attend the opening conference and ask about the scope and reason for the inspection (complaint, referral, emphasis program, incident or programmed).
4. Accompany the inspector at all times. Take the same photographs and measurements, and note every item discussed.
5. Answer questions truthfully and factually; do not guess or speculate. Employees may be interviewed privately and may have a representative present.
6. Correct simple hazards immediately when possible; document the correction.
7. Provide documents requested; keep a copy and list of everything provided.
8. Attend the closing conference. Send any citation to the Safety Department the same day; contest deadlines are short (15 working days under federal OSHA).
For context, OSHA’s maximum civil penalties for 2026 are $16,550 per serious or other-than-serious violation and $165,514 per willful or repeated violation. State Plan penalties may differ.
References: OSHA 2026 Civil Penalty Adjustments
40. Drug and Alcohol Use
No one may work while impaired by alcohol, cannabis, illegal drugs or misused medication. Workers taking medication that may affect alertness must tell their supervisor so work can be adjusted. Testing is performed under NM&C’s separate drug and alcohol policy, customer requirements and state law. Post-incident testing is not used to discourage injury reporting, consistent with 29 CFR 1904.35.
41. Accountability and Discipline
Safe work is recognized and unsafe work is corrected. Discipline for NM&C employees normally follows these steps, and serious or willful violations may skip directly to the later steps:
Step | Action |
1 | Coaching and documented verbal warning. |
2 | Written warning and retraining. |
3 | Final written warning and/or suspension. |
4 | Termination of employment. |
Examples of conduct that may result in immediate removal from the site: disabling a guard or lockout, working at height without required fall protection, entering a permit space without a permit, working impaired, violence or threats, and falsifying safety records. Service Provider workers may be removed from NM&C sites under the subcontract terms.
42. Records Retention
Record | Minimum Retention |
OSHA 300, 300A and 301 (or equivalent) | 5 years after the year covered |
Employee exposure records (silica, asbestos, lead, noise monitoring) | 30 years (29 CFR 1910.1020) |
Employee medical records | Duration of employment plus 30 years |
Training records, Pre-Task Plans, toolbox talks, inspections | NM&C standard: 5 years (some states require at least 1 to 3 years) |
Incident investigations, Event Reports, Witness Accounts | 5 years, or longer if a claim or lawsuit is pending |
Lockout procedures and annual inspections | Current version plus 3 years |
Hot work permits | NM&C standard: 1 year, or as required by the customer |
43. State Compliance Exhibits
NM&C works in all 50 states and the District of Columbia. This document is the national master program and uses federal OSHA as its baseline. A separate State Compliance Exhibit for each state and DC lists the requirements that go beyond, or differ from, federal rules for commercial construction and facility maintenance work. Each exhibit is part of this program for work in that state; it does not replace any section of the master.
Twenty-two State Plans cover private-sector workers: Alaska, Arizona, California, Hawaii, Indiana, Iowa, Kentucky, Maryland, Michigan, Minnesota, Nevada, New Mexico, North Carolina, Oregon, Puerto Rico, South Carolina, Tennessee, Utah, Vermont, Virginia, Washington and Wyoming. Connecticut, Illinois, Maine, Massachusetts, New Jersey, New York and the U.S. Virgin Islands have plans that cover only public employees, so federal OSHA covers NM&C’s commercial work there. State Plans must be at least as effective as federal OSHA and may be stricter.
References: OSHA State Plans | OSHA State Plan FAQs
How the exhibits are used
1. Before work starts. The PM reviews the exhibit for the state where the work is located, completes its project checklist, and records any added requirement on the Pre-Task Plan or project start-up documents (permits, notices, certifications, written plans).
2. Most protective rule governs. When a state rule, a city or county rule, a customer rule or this program differ, the most protective requirement applies.
3. Local rules. Some cities and counties add their own requirements (for example, New York City site safety training). The PM confirms local rules during preconstruction or dispatch.
4. Reporting. In State Plan states, serious injuries and fatalities are reported to the State Plan agency on that state’s deadline, which may be shorter than the federal deadline.
5. Service Providers. Service Providers must meet the state requirements that apply to their own employees and provide proof when asked.
Exhibit index
Select an exhibit number to open that state’s exhibit.
State | Exhibit Number | Private-Sector OSHA Coverage |
Alabama | Federal OSHA | |
Alaska | State Plan (private sector) | |
Arizona | State Plan (private sector) | |
Arkansas | Federal OSHA | |
California | State Plan (private sector) | |
Colorado | Federal OSHA | |
Connecticut | Federal OSHA (State Plan covers public employees only) | |
Delaware | Federal OSHA | |
District of Columbia | Federal OSHA | |
Florida | Federal OSHA | |
Georgia | Federal OSHA | |
Hawaii | State Plan (private sector) | |
Idaho | Federal OSHA | |
Illinois | Federal OSHA (State Plan covers public employees only) | |
Indiana | State Plan (private sector) | |
Iowa | State Plan (private sector) | |
Kansas | Federal OSHA | |
Kentucky | State Plan (private sector) | |
Louisiana | Federal OSHA | |
Maine | Federal OSHA (State Plan covers public employees only) | |
Maryland | State Plan (private sector) | |
Massachusetts | Federal OSHA (State Plan covers public employees only) | |
Michigan | State Plan (private sector) | |
Minnesota | State Plan (private sector) | |
Mississippi | Federal OSHA | |
Missouri | Federal OSHA | |
Montana | Federal OSHA | |
Nebraska | Federal OSHA | |
Nevada | State Plan (private sector) | |
New Hampshire | Federal OSHA | |
New Jersey | Federal OSHA (State Plan covers public employees only) | |
New Mexico | State Plan (private sector) | |
New York | Federal OSHA (State Plan covers public employees only) | |
North Carolina | State Plan (private sector) | |
North Dakota | Federal OSHA | |
Ohio | Federal OSHA | |
Oklahoma | Federal OSHA | |
Oregon | State Plan (private sector) | |
Pennsylvania | Federal OSHA | |
Rhode Island | Federal OSHA | |
South Carolina | State Plan (private sector) | |
South Dakota | Federal OSHA | |
Tennessee | State Plan (private sector) | |
Texas | Federal OSHA | |
Utah | State Plan (private sector) | |
Vermont | State Plan (private sector) | |
Virginia | State Plan (private sector) | |
Washington | State Plan (private sector) | |
West Virginia | Federal OSHA | |
Wisconsin | Federal OSHA | |
Wyoming | State Plan (private sector) |
KEEP THE EXHIBITS CURRENT
State and local rules change often. The Safety Department reviews every exhibit at least once a year, whenever a state adopts or changes a rule, and whenever NM&C starts work in a new city or county. Each exhibit summarizes key requirements and is not a complete list of every state law. Exhibit revisions do not require a revision of this master unless a master section changes.
44. Program Evaluation and Annual Review
- The Safety Department and Executive Leadership review this program at least every 12 months, and after any fatality, serious injury, significant OSHA citation, or major change in operations or regulations.
- The review looks at leading indicators (Pre-Task Plan completion, inspections, training completion, near-miss reports, corrective-action closure time) and lagging indicators (total recordable incident rate, DART rate, EMR, vehicle incidents, citations).
- Results, goals and changes are documented in the revision history below and communicated to employees and Service Providers.
Version | Date | Summary of Changes |
1.0 | 10/28/2026 | Initial issue of the NM&C Safety & Environmental Management Program, including Appendices A through K, issued as the national master for use with the State Compliance Exhibits for all 50 states and the District of Columbia. |
1.1 | 11/16/2026 | Effective Date set to November 16, 2026 and Next Scheduled Review to November 16, 2027. Posted in full at go-nmc.com/safety-environmental-management-program as Exhibit A to the Vendor Master Terms & Conditions and the Service Provider Agreement. Letterhead phone number changed to the main line, 561-288-6278. |
Appendix A – Site Emergency Information
PURPOSE
Complete before work starts on every project and post it in the field office, job box or vehicle. Service calls use the customer’s emergency plan; record key items here when the call lasts more than one day.
Contact | Name / Organization | Phone |
Emergency Services | Name or organization | 911 |
NM&C Project Manager | Name or organization | Phone |
NM&C Superintendent / Site Lead | Name or organization | Phone |
NM&C Safety Department | Name or organization | Phone |
NM&C Main Office | Name or organization | 855-662-3499 |
Customer Site Contact | Name or organization | Phone |
Building Security / Alarm Company | Name or organization | Phone |
Utility – Electric | Name or organization | Phone |
Utility – Gas | Name or organization | Phone |
Utility – Water | Name or organization | Phone |
811 Utility Locate | Name or organization | 811 |
Poison Control | Name or organization | 1-800-222-1222 |
OSHA (Severe Injury Reporting) | Name or organization | 1-800-321-6742 |
National Response Center (Spills) | Name or organization | 1-800-424-8802 |
Appendix B – Pre-Task Plan and Service Call Safety Check
PURPOSE
Part 1 is completed by the Site Lead and crew before each task and each shift on projects. Part 2 is the quick check every technician completes on arrival at a service call. Both are kept with the job records.
Part 1 – Pre-Task Plan
Part 2 – Service Call Safety Check
Check | Yes / No / N/A | Notes |
Checked in with the manager and signed the vendor log | Yes / No / N/A | Notes |
Customer site rules and emergency exits reviewed | Yes / No / N/A | Notes |
Work area walked before unloading tools | Yes / No / N/A | Notes |
Public and employee traffic separated (barricades / signs) | Yes / No / N/A | Notes |
Energy sources identified; own lock and tag applied | Yes / No / N/A | Notes |
Ladder, lift or roof access planned; fall protection ready | Yes / No / N/A | Notes |
Skylights, roof edges and hatches identified (roof work) | Yes / No / N/A | Notes |
No suspect asbestos, lead or mold disturbed (or cleared by PM) | Yes / No / N/A | Notes |
Chemicals and SDSs available | Yes / No / N/A | Notes |
Fire alarm, sprinklers and exits unaffected (or impairment approved) | Yes / No / N/A | Notes |
Working-alone check-in schedule set | Yes / No / N/A | Notes |
PPE in use (eyes, hands, high-vis, hard hat as needed) | Yes / No / N/A | Notes |
Area cleaned, equipment status reported to manager at departure | Yes / No / N/A | Notes |
Appendix C – OSHA and Regulatory Reference Links
PURPOSE
These official resources support this program. They do not replace NM&C reporting, customer, contract, insurance or federal, state and local requirements.
Resource | When to Use It | Link |
OSHA Forms 300, 300A and 301 | Recording work-related injuries and illnesses | |
OSHA Severe Injury Reporting | Reporting fatalities, hospitalizations, amputations and eye loss | |
OSHA Incident Investigation | Guidance on finding root causes | |
OSHA Incident Investigation Guide | Investigation methods and sample tools | |
29 CFR 1910.147 Appendix A | Baseline example of a lockout procedure | |
OSHA Control of Hazardous Energy | Lockout program elements and resources | |
OSHA Training Sign-In Sheet | Alternative attendance sheet for training | |
OSHA Sign-In Sheet | Simple attendance roster | |
OSHA State Plans | Confirming which agency covers a state | |
OSHA Heat Rulemaking | Status of the federal heat rule | |
HazCom 2024 Compliance Dates | Label, program and training update deadlines | |
OSHA Multi-Employer Citation Policy | Understanding controlling-employer duties |
Appendix D – Event Report – Injury, Near Miss, Damage or Environmental Release
PURPOSE
Use for any injury or illness, first aid, near miss, property or equipment damage, utility strike, fire, spill or release, vehicle event, security event or regulatory contact. Submit to the NM&C PM within 24 hours. Do not enter medical, wage, date-of-birth, Social Security or workers’ compensation information on this form; those are handled separately and confidentially.
Potential severity: ☐ Minor ☐ Moderate ☐ Serious ☐ Life-threatening / fatal
Describe the sequence of events: what was being done, what went wrong, and what happened next. Attach photos, sketches, permits, Pre-Task Plans and SDSs.
Describe the event
Immediate causes (check all that apply)
Underlying causes (check all that apply)
Root cause summary
Explain the root cause(s) in plain language
Role | Printed Name and Signature | Date |
Prepared By | Name / Signature | Date |
Service Provider Supervisor | Name / Signature | Date |
NM&C Project Manager | Name / Signature | Date |
Safety Department Review | Name / Signature | Date |
Appendix E – Witness Account
PURPOSE
Complete one form per witness, as soon as possible after the event, in the witness’s own words. Record only what you personally saw or heard; do not guess or assign blame. Attach more pages if needed.
What did you see or hear?
Facts only
Where were you, and where did it happen?
Location details
What happened just before, during and after?
Sequence and conditions
Anyone else who saw it, or anything else we should know?
Other witnesses or information
I confirm this account is true and complete to the best of my knowledge.
Role | Printed Name and Signature | Date |
Witness | Name / Signature | Date |
Received By (Supervisor / NM&C) | Name / Signature | Date |
Appendix F – Toolbox Talk and Training Sign-In
PURPOSE
Use for toolbox talks, pre-task huddles, site orientations, safety stand-downs and training sessions. Keep with the project or Service Provider records.
Topics covered
Key points and worker questions or concerns
Summary
Appendix G – Hazardous Energy Control (Lockout/Tagout) Procedure
PURPOSE
This is NM&C’s minimum procedure for controlling hazardous energy during servicing and maintenance. Service Providers must also have their own compliant energy control program, training, hardware and equipment-specific procedures. It applies to electrical, mechanical, hydraulic, pneumatic, chemical, thermal, gravity and stored energy.
- Installing, repairing, adjusting, inspecting, cleaning, unjamming, troubleshooting, demolishing or commissioning equipment where someone could be hurt by unexpected start-up or release of energy.
- Any time a guard or safety device must be removed or bypassed, or a body part enters a point of operation or danger zone.
- Exception: work on cord-and-plug equipment when the plug is removed and kept under the exclusive control of the worker performing the work.
Role | Duties |
Authorized Employee | Trained to apply locks and tags; isolates energy, verifies zero energy, performs the work, and removes only their own lock. |
Affected Employee | Operates or works near the equipment; is told before shutdown and before restart; never tries to restart locked equipment. |
Service Provider Supervisor / Competent Person | Plans the lockout, confirms the procedure is followed, coordinates group lockout and shift changes, and confirms everyone is clear before restart. |
NM&C Project Manager | Coordinates shutdown approvals and access with the customer, and requests procedures and records. |
# | Step | What to Do |
1 | Prepare | Identify all energy sources, their magnitude, isolation points and stored energy using the equipment-specific sheet (Appendix H) or manufacturer information. |
2 | Notify | Tell affected employees and the customer contact that the equipment will be shut down and locked out, and why. |
3 | Shut down | Stop the equipment with its normal controls. |
4 | Isolate | Operate every energy-isolating device (disconnects, breakers, valves, blocks) to cut off each energy source. |
5 | Lock and tag | Each authorized employee places a personal lock and a tag showing their name on each isolation point, or on a group lockbox. |
6 | Control stored energy | Bleed, vent, drain, discharge, block or restrain stored and residual energy (springs, capacitors, hydraulics, elevated parts, pressure). |
7 | Verify | Confirm everyone is clear, then try the normal start controls and test with a meter where electrical. Return the controls to OFF after the test. |
8 | Work | Begin work only after zero energy is verified. Re-verify if work is interrupted or conditions change. |
# | Step | What to Do |
1 | Check the equipment | Tools and materials removed, guards reinstalled, equipment intact and ready. |
2 | Clear the area | All workers are in a safe place and out of the line of fire. |
3 | Set controls | Operating controls are OFF or in neutral. |
4 | Remove locks | Each person removes only their own lock and tag. |
5 | Restore and notify | Re-energize following the equipment sheet, and tell affected employees and the customer the work is complete. |
6 | Test and monitor | Start the equipment and watch it run safely before returning it to service. |
- Group lockout: a primary authorized employee locks the isolation points and places the keys in a lockbox; every worker in the group adds a personal lock to the lockbox and removes it only when their own work is done.
- Shift change: the incoming worker applies a lock before the outgoing worker removes theirs, so protection is never interrupted.
- If a worker leaves the site with a lock on, the lock may be removed only under a documented employer procedure: the supervisor verifies the worker is not at the site, makes every reasonable effort to reach them, and ensures they are told before returning to work.
Appendix H – Equipment Energy Control Sheet
PURPOSE
Complete one sheet for each machine, system, circuit or group of identical equipment that needs specific lockout steps. Attach or insert photos of each isolation point. Review annually and when the equipment changes.
Sequence, blocking, bleed-down, stored energy, arc flash and PPE requirements, start-up limits, customer contacts
Enter special instructions
Role | Printed Name and Signature | Date |
Service Provider Supervisor / Competent Person | Name / Signature | Date |
Authorized Employee | Name / Signature | Date |
NM&C Project Manager (if required) | Name / Signature | Date |
Appendix I – Hot Work Permit
PURPOSE
Required for welding, cutting, brazing, soldering, torch work and spark-producing grinding outside a designated hot work area. Valid for one shift at one location. Post at the work area; return to the Site Lead when the final check is complete. Follow the customer’s or insurer’s hot work form if stricter.
Role | Printed Name and Signature | Date |
Permit Authorizer | Name / Signature | Date |
Hot Work Operator | Name / Signature | Date |
Fire Watch | Name / Signature | Date |
Appendix J – Weekly Site Safety Walk
PURPOSE
Completed at least weekly on every project by the Superintendent with a crew representative. Correct items on the spot where possible and log the rest below.
Item | OK / Fix / N/A | Notes |
Site Emergency Information posted; first aid kit stocked | OK / Fix / N/A | Notes |
Fire extinguishers in place and charged | OK / Fix / N/A | Notes |
Exits, aisles and egress clear; exit signs visible | OK / Fix / N/A | Notes |
Public separated from work (barricades, signage) | OK / Fix / N/A | Notes |
Housekeeping and debris removal | OK / Fix / N/A | Notes |
Floor holes and openings covered and marked | OK / Fix / N/A | Notes |
Guardrails / fall protection in place where required | OK / Fix / N/A | Notes |
Ladders in good condition and used correctly | OK / Fix / N/A | Notes |
Scaffolds inspected and tagged | OK / Fix / N/A | Notes |
Lifts inspected; operators trained | OK / Fix / N/A | Notes |
Cords, GFCIs and temporary power in good condition | OK / Fix / N/A | Notes |
Electrical panels closed and accessible | OK / Fix / N/A | Notes |
LOTO applied where required | OK / Fix / N/A | Notes |
Hot work permits posted; fire watch present | OK / Fix / N/A | Notes |
SDSs available; containers labeled | OK / Fix / N/A | Notes |
Silica / dust controls working | OK / Fix / N/A | Notes |
PPE in use | OK / Fix / N/A | Notes |
Pre-Task Plans completed and signed | OK / Fix / N/A | Notes |
Heat / cold controls in place | OK / Fix / N/A | Notes |
Material storage stable and secured | OK / Fix / N/A | Notes |
Appendix K – Program Acknowledgment
PURPOSE
Each NM&C employee signs at hire and after each major revision. Each Service Provider signs once per year, or once per project if not on file, for its company and workers.
I have received, or been given access to, the NM&C Inc. Safety & Environmental Management Program (2026 Edition). I understand that I must follow it, that I have the right and responsibility to stop unsafe work, and that I can report hazards and injuries without fear of retaliation. If I am signing for a Service Provider, I confirm that my company will train its workers on the parts of this program that apply to their work and will meet or exceed these requirements.